Correction to : Combining multicriteria decision analysis and cost–benefit analysis in the assessment of maritime projects financed by the European Investment Bank
Clintworth, Mark and Boulougouris, Evangelos and Lee, Byung Suk (2018) Correction to : Combining multicriteria decision analysis and cost–benefit analysis in the assessment of maritime projects financed by the European Investment Bank. Maritime Economics and Logistics. ISSN 1479-294X (https://doi.org/10.1057/s41278-018-0109-9)
Full text not available in this repository.Request a copyAbstract
An acknowledgement was omitted from this article: The views expressed in this paper represent those of the authors and not necessarily those of any of their affiliations. No EIB client confidential data has been utilised for the purposes of this research.
ORCID iDs
Clintworth, Mark ORCID: https://orcid.org/0000-0003-3152-8177, Boulougouris, Evangelos ORCID: https://orcid.org/0000-0001-5730-007X and Lee, Byung Suk ORCID: https://orcid.org/0000-0002-6583-4378;-
-
Item type: Article ID code: 66796 Dates: DateEvent12 June 2018Published12 June 2018Published Online12 June 2018AcceptedSubjects: Social Sciences > Industries. Land use. Labor > Risk Management
Naval Science > Naval architecture. Shipbuilding. Marine engineeringDepartment: Faculty of Engineering > Naval Architecture, Ocean & Marine Engineering Depositing user: Pure Administrator Date deposited: 04 Feb 2019 11:53 Last modified: 11 Nov 2024 12:13 Related URLs: URI: https://strathprints.strath.ac.uk/id/eprint/66796
CORE (COnnecting REpositories)