Browse by Journal or other publication
Conference or Workshop Item
Bititci, Umit and Gembeh, A.B. (1997) Structured design technique for the implementation of quality procedures to ISO 9001. In: Advances in Manufacturing Technology, 1997-09-01.
Bititci, Umit and Muirhead, C and Moreland, S and Pandya, K.V. (1996) Development of procedures in a small screen printing company. In: Advances in Manufacturing Technology, 1997-09-01.
Bititci, Umit (1995) A methodology for implementation of integrated performance measurement systems. In: Advances in Manufacturing Technology, 1997-09-01.
Bititci, Umit (1993) Integrated performance measures the key to integration. In: Advances in Manufacturing Technology, 1997-09-01.
Bititci, Umit and Thomson, William and Mullen, T.D. (1990) Implementing JIT in a small manufacturing company. In: Advances in Manufacturing Technology, 1997-09-01.
Bititci, Umit and Large, M (1989) Modular architecture for cell management systems. In: Advances in Manufacturing Technology, 1997-09-01.
Bititci, Umit and Gohari, M (1989) Diagnostic systems for FMS. In: Advances in Manufacturing Technology, 1997-09-01.
Bititci, Umit (1989) A generic architecture for cell management and control systems. In: Advances in Manufacturing Technology, 1997-09-01.
Bititci, Umit (1988) Use of expert systems in the specification of manufacturing systems. In: Advances in Manufacturing Technology, 1997-09-01.