Optimal dynamic operations scheduling for small-scale satellites
Komninou, Eirini and Vasile, Massimiliano and Minisci, Edmondo (2012) Optimal dynamic operations scheduling for small-scale satellites. In: 63rd International Astronautical Congress, 2012-10-01 - 2012-10-05.
Preview |
PDF.
Filename: IAC_12_EKomninou.pdf
Preprint Download (848kB)| Preview |
Abstract
A satellite's operations schedule is crafted based on each subsystem/payload operational needs, while taking into account the available resources on-board. A number of operating modes are carefully designed, each one with a different operations plan that can serve emergency cases, reduced functionality cases, the nominal case, the end of mission case and so on. During the mission span, should any operations planning amendments arise, a new schedule needs to be manually developed and uplinked to the satellite during a communications' window. The current operations planning techniques over a reduced number of solutions while approaching operations scheduling in a rigid manner. Given the complexity of a satellite as a system as well as the numerous restrictions and uncertainties imposed by both environmental and technical parameters, optimising the operations scheduling in an automated fashion can over a flexible approach while enhancing the mission robustness. In this paper we present Opt-OS (Optimised Operations Scheduler), a tool loosely based on the Ant Colony System algorithm, which can solve the Dynamic Operations Scheduling Problem (DOSP). The DOSP is treated as a single-objective multiple constraint discrete optimisation problem, where the objective is to maximise the useful operation time per subsystem on-board while respecting a set of constraints such as the feasible operation timeslot per payload or maintaining the power consumption below a specific threshold. Given basic mission inputs such as the Keplerian elements of the satellite's orbit, its launch date as well as the individual subsystems' power consumption and useful operation periods, Opt-OS outputs the optimal ON/OFF state per subsystem per orbital time step, keeping each subsystem's useful operation time to a maximum while ensuring that constraints such as the power availability threshold are never violated. Opt-OS can provide the flexibility needed for designing an optimal operations schedule on the spot throughout any mission phase as well as the ability to automatically schedule operations in case of emergency. Furthermore, Opt-OS can be used in conjunction with multi-objective optimisation tools for performing full system optimisation. Based on the optimal operations schedule, subsystem design parameters are being optimised in order to achieve the maximal usage of the satellite while keeping its mass minimal.
ORCID iDs
Komninou, Eirini ORCID: https://orcid.org/0000-0002-0204-9022, Vasile, Massimiliano ORCID: https://orcid.org/0000-0001-8302-6465 and Minisci, Edmondo ORCID: https://orcid.org/0000-0001-9951-8528;-
-
Item type: Conference or Workshop Item(Paper) ID code: 43210 Dates: DateEvent1 October 2012PublishedSubjects: Technology > Mechanical engineering and machinery
Technology > Motor vehicles. Aeronautics. AstronauticsDepartment: Faculty of Engineering > Mechanical and Aerospace Engineering
Technology and Innovation Centre > Advanced Engineering and ManufacturingDepositing user: Pure Administrator Date deposited: 15 Mar 2013 10:40 Last modified: 11 Nov 2024 16:36 Related URLs: URI: https://strathprints.strath.ac.uk/id/eprint/43210