Painting a clearer picture
Ault, G.W. and Currie, R.A.F. and Douglas, J. (2007) Painting a clearer picture. Power Engineer, 21 (2). pp. 42-43. ISSN 1479-8344
Full text not available in this repository.Request a copyAbstract
This paper presents the Distribution Working Group run by the University of Strathclyde is undertaking a project to provide a clear picture of the activities of active management in distributed generation. Active network management (ANM) solutions are developed to enable the increase connection of DG. ANM can be described as the control and management of network equipment and the devices they serve in normal conditions to enhance the utilisation of the network assets and minimise the requirement for their reinforcement to enable development of the system. The main outcomes of a recent project to collate and analyse activities that are ongoing or completed in the area of active management are described in the article
ORCID iDs
Ault, G.W. ORCID: https://orcid.org/0000-0001-6369-4300, Currie, R.A.F. and Douglas, J.;-
-
Item type: Article ID code: 11944 Dates: DateEventApril 2007PublishedSubjects: Technology > Electrical engineering. Electronics Nuclear engineering Department: Faculty of Engineering > Electronic and Electrical Engineering Depositing user: Strathprints Administrator Date deposited: 16 Nov 2010 15:38 Last modified: 11 Nov 2024 09:01 Related URLs: URI: https://strathprints.strath.ac.uk/id/eprint/11944