NINES Project : 2A Battery Operational Effectiveness
Fan, Fulin and Xu, Han and Kockar, Ivana and Adams, Stevie and Coote, Nathan (2017) NINES Project : 2A Battery Operational Effectiveness. Scottish & Southern Electricity Networks, Glasgow. (http://www.ninessmartgrid.co.uk/library/2a-nines-b...)
Preview |
Text.
Filename: SSEN_2017_NINES_Project_2A_Battery_Operational.pdf
Final Published Version Download (1MB)| Preview |
Abstract
This report provides a detailed review of the operational effectiveness of a valve regulated lead-acid (VRLA) Battery Energy Storage System (BESS) which has been installed as part of the NINES Project at Lerwick Power Station (LPS) on a distribution network operated by Scottish and Southern Electricity Networks (SSEN) in Shetland. The grid-scale VRLA BESS plays an important role in the time-shifting of conventional generation and renewable energy on the Shetland network.
ORCID iDs
Fan, Fulin ORCID: https://orcid.org/0000-0003-2450-6877, Xu, Han ORCID: https://orcid.org/0000-0002-9004-9830, Kockar, Ivana ORCID: https://orcid.org/0000-0001-9246-1303, Adams, Stevie and Coote, Nathan;-
-
Item type: Report ID code: 64828 Dates: DateEvent4 December 2017Published24 May 2017AcceptedSubjects: Technology > Electrical engineering. Electronics Nuclear engineering Department: Faculty of Engineering > Electronic and Electrical Engineering Depositing user: Pure Administrator Date deposited: 23 Jul 2018 09:44 Last modified: 20 Nov 2024 01:36 Related URLs: URI: https://strathprints.strath.ac.uk/id/eprint/64828