The application of a JIT assembly program, based upon modular master scheduling
Bititci, Umit and Little, Derek and Kehoe, D.F. and Goulding, K.G. (1987) The application of a JIT assembly program, based upon modular master scheduling. In: AUTOMAN 4 Conference, 1987-05-01.
Full text not available in this repository.Request a copyAbstract
This presentation looks at the application of a JIT assembly program, based upon modular master scheduling.
ORCID iDs
Bititci, Umit, Little, Derek ORCID: https://orcid.org/0000-0002-0966-5557, Kehoe, D.F. and Goulding, K.G.;-
-
Item type: Conference or Workshop Item(Paper) ID code: 33049 Dates: DateEvent1987PublishedSubjects: Technology > Engineering (General). Civil engineering (General) > Engineering design Department: Faculty of Engineering > Design, Manufacture and Engineering Management Depositing user: Pure Administrator Date deposited: 07 Sep 2011 12:58 Last modified: 11 Nov 2024 16:31 URI: https://strathprints.strath.ac.uk/id/eprint/33049
CORE (COnnecting REpositories)