The National Theatre Conservation Management Plan
Calder, Barnabas (2009) The National Theatre Conservation Management Plan. In: C20th society: Understanding Twentieth Century Cities - a Short Course, 1900-01-01.
Full text not available in this repository.Request a copyAbstract
Lecture on the National Theatre Conservation Management Plan. In 2007 the National Theatre began thinking about how its mission is reflected in its building. The priorities were three-fold: to maintain the fabric and infrastructure of a hardworking building; to continue to develop artistic capability; and to improve amenities for audiences. We wanted to explore ways in which the building could respond to the dramatically changing environment of the South Bank; and we saw the potential to open the building up, making it, in parts, literally more transparent so as to reveal the processes of the hundreds of craftspeople, designers, actors and technicians working under its roof.
-
-
Item type: Conference or Workshop Item(Paper) ID code: 14204 Dates: DateEvent22 September 2009PublishedSubjects: Fine Arts > Architecture Department: Faculty of Engineering > Architecture Depositing user: Miss Claire Hyland Date deposited: 17 May 2010 11:12 Last modified: 11 Nov 2024 16:24 URI: https://strathprints.strath.ac.uk/id/eprint/14204