Feasiblity of a hybrid CHP/GSHP system for the Tynecastle stadium
Tools
Kummert, M. (2008) Feasiblity of a hybrid CHP/GSHP system for the Tynecastle stadium. Case study. University of Strathclyde.
Full text not available in this repository.Request a copyAbstract
Paper describing the feasiblity of a hybrid CHP/GSHP system for the Tynecastle stadium project.
-
-
Item type: Monograph(Case study) ID code: 7485 Dates: DateEvent2008PublishedNotes: ESRU Consultancy Report E364 for SSE Energy Services Ltd Subjects: Technology > Mechanical engineering and machinery Department: Faculty of Engineering > Mechanical and Aerospace Engineering Depositing user: Strathprints Administrator Date deposited: 10 Feb 2010 10:46 Last modified: 11 Nov 2024 16:02 Related URLs: URI: https://strathprints.strath.ac.uk/id/eprint/7485
CORE (COnnecting REpositories)