Bititci, Umit (1995) A methodology for implementation of integrated performance measurement systems. In: Advances in Manufacturing Technology, 1997-09-01.
Full text not available in this repository. (Request a copy from the Strathclyde author)Abstract
This paper looks at a methodology for implementation of integrated performance measurement systems
| Item type: | Conference or Workshop Item (Paper) |
|---|---|
| ID code: | 33024 |
| Keywords: | methodology, implementation, integrated performance measurement, systems, Engineering design |
| Subjects: | Technology > Engineering (General). Civil engineering (General) > Engineering design |
| Department: | Faculty of Engineering > Design, Manufacture and Engineering Management |
| Related URLs: | |
| Depositing user: | Pure Administrator |
| Date Deposited: | 22 Sep 2011 15:39 |
| Last modified: | 04 Oct 2012 17:48 |
| URI: | http://strathprints.strath.ac.uk/id/eprint/33024 |
Actions (login required)
| View Item |
