Harrison, C.S. and Twist, R.J. and Hon, K.K.B. (1990) Simulation of the effects of uncertainty and its effects on production planning lead times. In: 6th International Conference on Computer Aided Production Engineering, 1990-11-01, Edinburgh.
Full text not available in this repository. (Request a copy from the Strathclyde author)| Item type: | Conference or Workshop Item (Paper) |
|---|---|
| ID code: | 14217 |
| Keywords: | uncertainty, production planning, lead time, Manufactures |
| Subjects: | Technology > Manufactures |
| Department: | Faculty of Engineering > Design, Manufacture and Engineering Management |
| Related URLs: | |
| Depositing user: | Dr. C.S. Harrison |
| Date Deposited: | 21 Jan 2010 17:46 |
| Last modified: | 04 Oct 2012 17:22 |
| URI: | http://strathprints.strath.ac.uk/id/eprint/14217 |
Actions (login required)
| View Item |
